MIDMARK - 400 KW ROOFTOP SOLAR, UMERGAON, GUJARAT

image

Project Details:

Location:
Umergaon, Gujarat
Commissioned:
April 2022
Capacity:
400 kWp
Estimated Savings Per Year:
Rs.38 lakhs per annum/-
Payback:
3 years 2 months

About MidMark’s 400 kW rooftop solar

MidMark India is a crucial supplier of intensive care beds, emergency trolleys, wheelchairs, and other vital accessories across hospitals in India.

In line with MidMark’s commitment to quality and sustainability, they have installed a 400 kilowatt rooftop solar system at their factory in Umergaon, Gujarat to cut costs and support their ISO 50001 certification.

Orb Energy’s rooftop solar installation now delivers 65% of their electricity! With solar now offsetting roughly 600 tonnes of CO2 emissions annually, saving MidMark approximately ₹38 lakhs ($45k USD) on electricity expenses every year.

“As a US-based multinational company, aligned to ISO 50001, we decided to install rooftop solar. In the process of selecting a provider, we received over 10 proposals from both local installers and MNCs. Among them was Orb Energy. Upon visiting Orb’s manufacturing facility, we were particularly impressed by the quality of their solar panels. In terms of system quality and pricing, and Orb Energy emerged as our preferred solar energy provider. “

Mr. Sunil S Mungarwadi
Senior Vice President – Manufacturing, MidMark, Umergaon, Gujarat

For a complimentary energy consultation and site visit.