3.08 Megawatt Ground Mounted Solar System for Dimo Castings, Bengaluru, Karnataka

Project Details:

Location:
Bangalore, Karnataka
Commissioned:
December 2023
Capacity:
3.08 MWp
Estimated Savings Per Year:
Rs.38 lakhs per annum/-
Payback:
3 years 6 months

About Dimo Castings’s 3.08 Megawatt Solar Park

Dimo Castings, is a leading aluminum die casting company in Bangalore. Faced with high power requirements and a soaring electricity bill, Mr. Muttu Krishnan turned to Orb Energy to purchase a 3.08 MW solar sub-array as part of Orb Energy’s 35 MW (DC) solar park in Arsikere, Karnataka.

What were the outcomes? Dimo’s electricity expenses have significantly dropped, and the company is now able to attract international buyers with its green credentials. What gave Mr. Muttu Krishnan the confidence to choose Orb? Orb Energy’s innovative collateral-free solar financing, gave him the confidence choose Orb for his solar needs.

image

“Adopting solar is going to give us a cost advantage, and when we export our products worldwide, most MNCs prefer products manufactured using renewable energy practices. Now we have the upper hand in sustainability. Orb Energy funded 75% of our project cost, which gave us confidence and made me immediately choose Orb Energy.”

Mr. P Muthukrishnan
Managing Director, Dimo Castings, Bengaluru, Karnataka

If you run a high power-consuming company and are burdened by hefty electricity bills, but do not have adequate roof space.